eVyoog
Efficiency · Production, Quality, Maintenance, Design, Testing

Thiran.ai

Where the work gets done, watched closely.

Valam Varthan Yukth Thittam Thiran Tharav

Thiran.ai enables business users to convert raw material into finished goods at an optimum level — utilizing resources fully to increase production capacity, and tracking every work order to completion.

Work Order & Job Log

Dynamic work orders, tracked from Gantt chart to completion.

Work orders generate dynamically based on order delivery date and process time. Job logs use a user-friendly dataflow you can extend for your own process — Moulding → Melting → Fettling, or any sequence your shop runs.

✓ Dynamic Work Order Generation
✓ Planning by Delivery Date & Process Time
✓ Work Order Status Tracking
✓ Configurable Job Log Table
Production Gantt chart

Features

Live OEE Dashboard

Complete view into production shop floor

Automatic Material Issue

Issued automatically against raw material usage

Time Management

Captures machine idle time, setting time and handling time

Maintenance Scheduling

Keep machines running with planned upkeep

Quality Checkpoints

Inspection built into the production flow

Custom Process Flows

Add process stages that mirror your actual floor

Application Architecture

What's inside, by category

Thiran.ai is the execution engine — it turns Thittam.ai's plans into released work, and continuously improves how that work gets done. This reflects the planned application scope for the family — a working architecture, not a claim that every application below is live today.

Manufacturing Execution
  • MES
  • Production Order Execution
  • Shop-Floor Control
  • Work Center & Machine Operations
  • Labor Tracking
  • WIP Tracking
  • Production Reporting
  • Material Consumption
  • Yield/Scrap/Rework Management
  • Production Traceability
  • Digital Work Instructions
Quality & Compliance Execution
  • QMS
  • Incoming/In-Process/Final Inspection
  • Statistical Process Control
  • Non-Conformance Management
  • CAPA
  • Root Cause Analysis
  • Calibration Management
  • Audit Management
  • Supplier & Customer Quality
  • Quality Documentation
Maintenance & Asset Operations
  • Enterprise Asset Maintenance
  • Preventive & Predictive Maintenance
  • Breakdown Maintenance
  • Condition Monitoring
  • Maintenance Work Orders
  • Spare Parts Execution
  • Machine Downtime Management
  • OEE Management
Warehouse, Logistics & Project Execution
  • WMS
  • Receiving
  • Put-away
  • Picking
  • Packing
  • Dispatch
  • Barcode/RFID
  • Yard Management
  • Transportation & Route Execution
  • Shipment & Delivery Management
  • Fleet Operations
  • Project Execution
  • Task Management
  • Resource Assignment
  • Milestone Tracking
  • Project Cost Control
Engineering, Digital Product & Service Execution
  • PLM
  • Engineering Change Management
  • Design & Prototype Management
  • Product Testing
  • Verification & Validation
  • Release Management
  • ALM
  • Requirements/Test/Defect Management
  • DevOps
  • CI/CD
  • Field Service
  • Service Work Orders
  • Installation
  • Commissioning
  • Repair
  • Warranty & After-Sales Service
Operational Excellence
  • Lean Management
  • Kaizen
  • Six Sigma
  • Continuous Improvement
  • Process Improvement
  • OEE
  • Productivity Management
  • Energy Efficiency
  • Safety/EHS
  • Operational Risk
  • Compliance Execution

See Thiran.ai on your own data.

Login to Portal Talk to Sales ↗